BMI Mechanical Heating, Ventilation and Air Conditioning
BMI Mechanical Heating, Ventilation and Air Conditioning

Starpoint Properties

System Evaluation and Optimization

Starpoint Properties manages two multi-story commercial office towers that were built in the 1970’s. At the time they took over, the two towers were suffering from a variety of deferred maintenance issues related to the central HVAC system. Previous changes in ownership and tenant turnover had left the facility to operate with a “run to failure” approach.

A system evaluation by BMI revealed that one of the facility’s two 100-ton chillers was cycling on and off much too frequently; at least 1-2 times per hour. This was causing unnecessary wear and damage to the unit, as well as excessive energy consumption. As the new owners of the property worked to improve the appearance and performance of the towers, they looked to BMI for a solution.

BMI’s technicians performed comprehensive maintenance and in-depth troubleshooting, identifying several neglected issues which they were able to repair. A fresh air economizer that hadn’t been used for several years was restored, offering energy savings and greener operations.

In the three years following the completion of this project, Starpoint Properties has experienced no unplanned system failures or downtime.

CHALLENGE

Determine the root cause of the 100-ton chiller’s malfunction, and restore to proper operating condition.

SOLUTION

  • Complete OEM service with additional testing, inspection and troubleshooting.
  • Repair and restoration of fresh air economizer.
  • Improvements to chiller controls and sequencing through installation of Optimal Start system.

BENEFITS

  • By using cool outside air, compressors were staying off until at least 11:00 am each day.
  • Electricity costs dropped by nearly 15% even though occupancy and overall use of the buildings had increased.
Factoid

Energy constitutes 63% of a facility’s total HVAC owning & operating costs.

Linc

Thank You for the quality of service that you have given this division over the past 20 years. Any time we have called with an issue regarding our air conditioning units, you have responded very quickly and professionally. Under our maintenance agreement you have kept all of our units serviced and in excellent running condition. Your staff is professional and always available to meet our needs in a timely manner.

Charlene White
Production Assistance
Berry Petroleum Company South Midway Sunset Asset Team division